华龙一号反应堆控制棒驱动线作为我国自主设计的全新产品,需要考核及验证驱动线在寿期内的安全功能、可运行性和抗震性能。文章论述了覆盖整个控制棒驱动线运行寿命周期的综合验证技术方案,包括控制棒驱动机构带配重寿命试验、棒位探测器鉴定试验、驱动线冷热态寿命综合性能试验、驱动线抗震试验等。研究了冷热态不同阶段试验、不同方向地震激励等因素对试验结果的影响,分析了主流和堆顶旁流流量敏感性、抗震先导试验与抗震试验结果差异的技术原因。驱动线综合验证试验获得了各种工况下华龙一号驱动线的运动特性和功能参数;验证了驱动线各项功能及理论分析的有效性。试验结果表明华龙一号反应堆控制棒驱动线设计能够良好地满足项目要求。
Abstract:[Objective] As China's self-developed third-generation pressurized water reactor, the HPR1000 is equipped with an independently designed control rod drive line, which acts as pivotal equipment for reactor reactivity regulation, power maintenance, and emergency shutdown. The drive line is the only movable integrated unit inside the reactor, and its performance directly governs nuclear plant operational safety. Compared with second-generation nuclear power units, the HPR1000 imposes more stringent technical requirements: a 60-year design lifetime, a 0.3 g seismic resistance criterion, and Class 1 nuclear safety grade for rod position detectors, along with innovative designs including an integrated pressure-bearing shell and double-tooth latch claws. Current studies mostly focus on individual tests rather than the systematic, full-lifecycle, comprehensive verification of the complete drive line. Given its novelty and insufficient engineering verification, full-scale integrated tests are urgently required. This study assesses the lifetime safety function, operational reliability, and seismic performance of the HPR1000 drive line; verifies the rationality of the structural design and the accuracy of theoretical simulations; reveals the influencing mechanism of thermal-hydraulic and seismic factors; and fills the technical gap in full-cycle verification for third-generation nuclear power drive lines. [Methods] A full-lifecycle comprehensive verification framework was established following a rational test sequence of individual equipment, cold-and hot-state lifetime performance, and formal seismic tests, supplemented by seismic precursor and ultimate lifetime exploration tests. For single equipment verification, a counterweight lifetime test of the control rod drive mechanism(CRDM) was implemented with 6 million stepping cycles to simulate actual high-temperature and high-pressure operating environments. Qualification tests covering functional inspection, aging, irradiation, mechanical load, and seismic assessment were completed for rod position detectors using structurally reserved scaled specimens. Using 1∶1 full-scale prototypes identical to actual reactor components, cold-and hot-state integrated tests were carried out on a large thermal-hydraulic facility under four typical working conditions. Over 9.12 million stepping operations and 707 rod drop tests were performed, together with sensitivity tests covering variations in the main flow, reactor top bypass flow, misalignment, initial rod positions, and CRDM ventilation loss. A newly developed multi-point loading seismic test device was adopted to provide bidirectional multi-point excitation. Five half-safe shutdown earthquake(SSE) tests and one formal SSE test were conducted with conservative load margins. Comparative analyses were performed between horizontal-only and coupled horizontal–vertical seismic excitations, as well as between precursor and formal seismic tests using thermally aged prototypes.[Results] All rod drop time indicators under normal and seismic conditions fully satisfied design limits with sufficient safety margins. The CRDM maintained stable operation throughout the lifetime test, and double-tooth latch claw wear stayed within the allowable range, whereas cavitation on magnetic isolation plates prompted optimization to nickel-based alloy materials. Rod position detectors passed all qualification tests and met Class 1 safety requirements. Main flow prolonged rod drop time by forming flow resistance, whereas top bypass flow exerted a slight opposite effect. A 5 mm design-limited misalignment barely increased friction and rod drop time, whereas excessive misalignment caused a sharp increase in friction. Even under complete ventilation loss, the CRDM coil temperature remained below the 200 ℃ design threshold. Post-test inspection confirmed prototype integrity, with all wear characteristics within expectations. Seismic tests showed that horizontal excitation dominates variations in rod drop time, whereas vertical seismic impact was negligible. Rod drop time of aged prototypes increased moderately compared with precursor tests due to elevated surface friction, rendering the evaluation more conservative. [Conclusions] The HPR1000 control rod drive line fully meets the design criteria of a 60-year lifetime, 0.3 g seismic resistance, and nuclear safety requirements, with excellent comprehensive performance. This study established a complete verification platform and mastered core test and analysis technologies. It quantitatively characterized the effects of temperature, flow rate, misalignment, and seismic excitation on drive line dynamic performance and effectively validated theoretical calculation and simulation models. The study also explored the ultimate service potential of the drive line and proposed targeted material optimization schemes. The findings provide technical support for the safe operation of HPR1000 units and offer a reliable reference for the design and verification of similar nuclear-grade key equipment.
[1]李冬生.华龙一号“177堆芯”特点分析[J].核动力工程,2022, 43(3):28–32.Li D S. Characteristic analyses of“177 core” of HPR1000[J].Nuclear Power Engineering, 2022, 43(3):28–32.(in Chinese)
[2]宫爱成,臧新,刘勇,等.“华龙一号”核电厂一二回路匹配功能设计及验证[J].核科学与工程, 2024, 44(4):730–737.Gong A C, Zang X, Liu Y, et al. The design and verification of HPR1000 primary-secondary circuit control function[J]. Nuclear Science and Engineering, 2024, 44(4):730–737.(in Chinese)
[3]顾汉洋,张朝柱,陈宇清,等. AP1000控制棒驱动线落棒试验研究[J].核动力工程, 2015, 36(4):145–148.Gu H Y, Zhang C Z, Chen Y Q, et al. Study on drop performance test of AP1000 control rod drive line[J]. Nuclear Power Engineering, 2015, 36(4):145–148.(in Chinese)
[4]杜建勇,李朋洲,李琦,等. ACP1000控制棒驱动线抗震试验研究[J].核动力工程, 2015, 36(5):105–107.Du J Y, Li P Z, Li Q, et al. Research on seismic test of ACP1000control rod drive line[J]. Nuclear Power Engineering, 2015,36(5):105–107.(in Chinese)
[5]李琦,李朋洲,李锡华,等. CAP1400控制棒驱动线抗震试验研究[J].核动力工程, 2016, 37(增刊2):70–72.Li Q, Li P Z, Li X H, et al. Study on seismic test of CAP1400control rod drive line[J]. Nuclear Power Engineering, 2016,37(S2):70–72.(in Chinese)
[6]Angele K, Odemark Y, Cehlin M, et al. Flow mixing inside a control-rod guide tube-Experimental tests and CFD simulations[J]. Nuclear Engineering and Design, 2011, 241(12):4803–4812.
[7]Choi M H, Kim G H, Sun J O, et al. Seismic test of the control rod drive mechanism for JRTR[J]. Transactions of the Korean Society for Noise and Vibration Engineering, 2016, 26(5):552–558.
[8]Ahn K, Lee J S. Dynamic equivalent model of a SMART control rod drive mechanism for a seismic analysis[J]. Nuclear Engineering and Technology, 2020, 52(8):1834–1846.
[9]Zheng Y H, Bo H L, Dong D. Seismic analysis of hydraulic control rod driving system[J]. Journal of Nuclear Science and Technology, 2002, 39(12):1289–1293.
[10]刘言午,黄炳臣,冉小兵,等.反应堆控制棒落棒时间计算方法分析[J].核动力工程, 2014, 35(6):106–110.Liu Y W, Huang B C, Ran X B, et al. Analysis of calculation method for reactor control rod drop time[J]. Nuclear Power Engineering, 2014, 35(6):106–110.(in Chinese)
[11]陈永超,刘言午,李鹏,等.反应堆控制棒驱动线落棒过程动力学分析与研究[J].核科学与工程, 2024, 44(5):995–1003.Chen Y C, Liu Y W, Li P, et al. Study on the dynamics in the control rod drive line during the rod dropping process[J]. Nuclear Science and Engineering, 2024, 44(5):995–1003.(in Chinese)
[12]魏乔苑,张飞,吴和北,等.控制棒驱动机构运动过程的联合数值仿真研究[J].核动力工程, 2018, 39(5):137–141.Wei Q Y, Zhang F, Wu H B, et al. Study on united numerical simulation for stepping motion of control rod drive mechanism[J]. Nuclear Power Engineering, 2018, 39(5):137–141.(in Chinese)
[13]鲁治诚,尚尔涛,伍时建,等.控制棒驱动机构与反应堆堆顶组合模型的抗震分析[J].装备环境工程, 2019, 16(2):65–69.Lu Z C, Shang E T, Wu S J, et al. Seismic analysis of assembled model of control rod drive mechanism and reactor head package[J]. Equipment Environmental Engineering, 2019, 16(2):65–69.(in Chinese)
[14]陈永超,魏行方,刘言午,等.反应堆压力容器顶盖腔室流场分析和试验研究[J].核动力工程, 2025, 46(3):34–41.Chen Y C, Wei X F, Liu Y W, et al. Analysis and experimental study on flow field in RPV head plenum[J]. Nuclear Power Engineering, 2025, 46(3):34–41.(in Chinese)
[15]HAF J0053核设备抗震鉴定试验指南[S].HAF J0053 Nuclear equipment seismic qualification tests guidelines[S].(in Chinese)
[16]HAD 102/02—2019核动力厂抗震设计与鉴定[S].HAD 102/02—2019 Nuclear power plant seismic design and qualification[S].(in Chinese)
基本信息:
DOI:10.16791/j.cnki.sjg.2026.09.001
中图分类号:TL351.5;TM623
引用信息:
[1]刘言午,陈永超,赵毛毛,等.华龙一号控制棒驱动线综合验证试验研究[J].实验技术与管理,2026,43(09):1-9.DOI:10.16791/j.cnki.sjg.2026.09.001.
2026-05-10
2026
2026-06-04
2026-06-18
2026
1
2026-09-10
2026-09-10
2026-09-10